Tools

Carbon Capture Costs: FEED & pre-FEED Cost Reports

Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection48 reports
Comparing 3 reports — tab selection applies to every column.

CEMEX / Balcones Cement Plant

Cementpre-FEED· Membrane Technology and Research (MTR)· 2022-06-03Project page ↗Cost report ↗
CO₂ captured
744,235t/yr
Capture efficiency
75.0%
Utilization
90.0%
Parasitic load
36MW
CO₂ concentration
14.9%vol%
Facility scope
EngineeringSargent & Lundy
Point source approachPost-Combustion Capture
CO₂ concentration14.9% vol%
Flue gas pressure14 psia
Compressor nameplate
Compression stages
Compression inlet
Compression discharge2,213 psia
Description
Membrane Technology & Research Inc., with Sargent & Lundy and CEMEX, is designing a full-scale Polaris membrane CO₂ capture system for the CEMEX Balcones cement plant in New Braunfels, Texas, targeting about 1 million tonnes of CO₂ capture annually. The study will develop the design basis, process design, cost estimates, permitting and safety reviews, constructability assessment, and a techno-economic analysis. Sargent & Lundy will lead the design work, while CEMEX will provide site-specific data for integration.

Tampa Electric Polk Power Station Unit 2

Natural GasFEED· Tampa Electric Company· 2025-11-14Project page ↗Cost report ↗
CO₂ captured
3,420,780t/yr
Capture efficiency
95.0%
Utilization
Parasitic load
MW
CO₂ concentration
4.5%vol%
Facility scope
EngineeringSargent & Lundy
Point source approachPost-Combustion Capture
CO₂ concentration4.5% vol%
Flue gas pressure14 psia
Compressor nameplate
Compression stages
Compression inlet
Compression discharge
Description
Tampa Electric Company, with ION Clean Energy, Sargent & Lundy, Koch Specialty Plant Services, and Siemens Energy, completed a FEED study to retrofit post-combustion CO2 capture onto Unit 2 of the Polk Power Station, a 1,190 MWe (1,168 MWe net) 4x4x1 natural gas combined cycle plant in Mulberry, Florida. Using ION Clean Energy's ICE-31 advanced solvent across two parallel capture trains, the design targets at least 95% capture, nearly 3.7 million tonnes of CO2 per year, with downstream Siemens compression and dehydration and integrated pipeline transport to dedicated Class VI geologic storage. Each train includes a direct contact cooler, absorber, stripper, and compression, with the absorber columns sized to support 1x1 operation at 75% combustion turbine load to preserve dispatch flexibility. The study was funded under DOE Award DE-FE0032224 and produced an AACE Class 3 (-20%/+30%) capital cost and cost-of-capture estimate.

Cleveland Cliffs / Burns Harbor

Iron and Steelpre-FEED· Dastur International· 2023-03-01Project page ↗Cost report ↗
CO₂ captured
2,800,000t/yr
Capture efficiency
95.0%
Utilization
Parasitic load
79MW
CO₂ concentration
21.9%vol%
Facility scope
EngineeringDastur International
Point source approachPost-Combustion Capture
CO₂ concentration21.9% vol%
Flue gas pressure17 psia
Compressor nameplate
Compression stages6
Compression inlet
Compression discharge2,215 psia
Description
Dastur International Inc., with Cleveland-Cliffs Inc., is designing a carbon capture system for the 5 mtpa integrated steel plant in Burns Harbor, Indiana, to capture 50–70% of CO₂ emissions from blast furnace gas. The system will combine a gas flow distribution network, a specialized conditioning process, and ION Clean Energy’s solvent-based capture technology with 90–98% efficiency, with water-gas shift reactors enabling higher capture rates. Dastur will lead overall plant integration and engineering, while ION designs the capture island and Dastur Energy optimizes design and energy performance.