Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection48 reports
Comparing 3 reports — tab selection applies to every column.

Rayburn Energy Station / Sherman Power Plant

Natural GasFEED· Bechtel· 2022-03-01Project page ↗Cost report ↗
CO₂ captured
645,000t/yr
Capture efficiency
85.0%
Utilization
57.0%
Parasitic load
67.3MW
CO₂ concentration
6.0%mol%
Facility scope
EngineeringBechtel
Point source approachPost-Combustion Capture
CO₂ concentration6.0% mol%
Flue gas pressure
Compressor nameplate
Compression stages4
Compression inlet
Compression discharge2,190 psia
Description
Bechtel National Inc., with the Electric Power Research Institute, is conducting a FEED study to retrofit Panda Power Funds’ 758 MWe natural gas combined cycle plant in Sherman, Texas, with a post-combustion CO₂ capture system. Using an open-access design and a conventional amine absorber-stripper system with a non-proprietary solvent such as MEA, the project targets CO₂ capture for enhanced oil recovery.

Tampa Electric Polk Power Station Unit 2

Natural GasFEED· Tampa Electric Company· 2025-11-14Project page ↗Cost report ↗
CO₂ captured
3,420,780t/yr
Capture efficiency
95.0%
Utilization
Parasitic load
MW
CO₂ concentration
4.5%vol%
Facility scope
EngineeringSargent & Lundy
Point source approachPost-Combustion Capture
CO₂ concentration4.5% vol%
Flue gas pressure14 psia
Compressor nameplate
Compression stages
Compression inlet
Compression discharge
Description
Tampa Electric Company, with ION Clean Energy, Sargent & Lundy, Koch Specialty Plant Services, and Siemens Energy, completed a FEED study to retrofit post-combustion CO2 capture onto Unit 2 of the Polk Power Station, a 1,190 MWe (1,168 MWe net) 4x4x1 natural gas combined cycle plant in Mulberry, Florida. Using ION Clean Energy's ICE-31 advanced solvent across two parallel capture trains, the design targets at least 95% capture, nearly 3.7 million tonnes of CO2 per year, with downstream Siemens compression and dehydration and integrated pipeline transport to dedicated Class VI geologic storage. Each train includes a direct contact cooler, absorber, stripper, and compression, with the absorber columns sized to support 1x1 operation at 75% combustion turbine load to preserve dispatch flexibility. The study was funded under DOE Award DE-FE0032224 and produced an AACE Class 3 (-20%/+30%) capital cost and cost-of-capture estimate.

Mustang Station Power Plant

Natural GasFEED· University of Texas at Austin· 2022-01-07Project page ↗Cost report ↗
CO₂ captured
853,644t/yr
Capture efficiency
90.0%
Utilization
52.0%
Parasitic load
46MW
CO₂ concentration
3.8%vol%
Facility scope
EngineeringAECOM
Point source approachPost-Combustion Capture
CO₂ concentration3.8% vol%
Flue gas pressure14 psia
Compressor nameplate
Compression stages3
Compression inlet75 psia
Compression discharge2,015 psia
Description
The University of Texas at Austin, with AECOM Technical Services and Trimeric Corporation, is conducting a FEED study for the Piperazine Advanced Stripper (PZAS) CO₂ capture process at Golden Spread Electric Cooperative’s Mustang Station in Denver City, Texas. Designed for two GE gas turbines with HRSGs and a steam turbine totaling 464 MWe, the PZAS process uses 30 wt% piperazine for higher efficiency, solvent stability, smaller absorber size, and cost savings compared to conventional amine systems. The project will deliver a 30–60% complete design package and a capital cost estimate with ±15% accuracy.