Tools

Carbon Capture Costs: FEED & pre-FEED Cost Reports

Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

CSV Export Available

Download the full Unified Carbon Capture FEED Costs dataset — updated regularly, delivered instantly.

Price: $3,800
Accepted:
VISAAMERICANEXPRESSPayGPay
View all downloads →
3 of 3 selectedClear selection48 reports
Comparing 3 reports — tab selection applies to every column.

Nutrien Redwater Nitrogen Operations

AmmoniaFEED· Nutrien· 2024-11-01Project page ↗
CO₂ captured
1,778,645t/yr
Capture efficiency
99.0%
Utilization
—
Parasitic load
—MW
CO₂ concentration
7.0%mol%
▸Fixed OpEx$60.7M
Report did not provide a further cost breakdown.
▸Variable OpEx$13.1M
Report did not provide a further cost breakdown.
Total Opex$73.7M

Holcim / Portland Cement Plant

Cementpre-FEED· Electricore· 2023-01-31Project page ↗Cost report ↗
CO₂ captured
1,733,750t/yr
Capture efficiency
90.0%
Utilization
—
Parasitic load
76MW
CO₂ concentration
10.1%vol%
▸Fixed OpEx—
Report did not provide a further cost breakdown.
▸Variable OpEx—
Report did not provide a further cost breakdown.
Total Opex$56.0M

Tampa Electric Polk Power Station Unit 2

Natural GasFEED· Tampa Electric Company· 2025-11-14Project page ↗Cost report ↗
CO₂ captured
3,420,780t/yr
Capture efficiency
95.0%
Utilization
—
Parasitic load
—MW
CO₂ concentration
4.5%vol%
▸Fixed OpEx—
Report did not provide a further cost breakdown.
▸Variable OpEx—
Report did not provide a further cost breakdown.
Total Opex$102.8M